Invite-only trail-building app

The map that doesn’t exist.

shrigdigs is a private, map-based build app for crews who cut their own lines. Scout it, sketch it, dig it, log it. It’s built so every coordinate stays between you and the people who showed up with a shovel.

  1. Scout
  2. Sketch
  3. Dig
  4. Ride
  5. Keep quiet

01 / Private by default

Your trails stay yours.

The best lines on the hill were built by a handful of people and a lot of wet weekends. shrigdigs is built so they stay that way.

  • A

    Invite-only crew

    Built to be invite-only. No public sign-up, no search, no discovery. The plan: you get on the map when your crew adds you.

  • B

    Private by design

    No public feed. No heatmap. No “trending near you.” shrigdigs is built so tracks and pins stay with the crew.

  • C

    Your crew holds the keys

    We’re building it so the crew decides who’s on the map, and who isn’t anymore.

02 / The map

Read the hill before you cut it.

One topo map for the whole crew. Record what’s there, sketch what’s next, and see every jump, berm and drain on the line.

Line 07Zone B
Topo
Crew only / 9
Stylized topographic map of a trail called Line 07 Illustrative mock-up, not a real place. Contour lines run across a forested hillside. A trail winds from a start point at the top left to an end point at the lower right, with feature pins for rollers, berms, a tabletop, a drop, a ladder, a step-down and a drain.
Dist--
Drop--
Avg--
Max--

Illustrative mock-up. Not a real place. Obviously.

01 / Interactive topo

Real terrain. Not a cartoon.

Contours, relief and drainage on one fast map. Pick any spot for its elevation and slope, and read the hill before anyone lifts a tool.

  • Contour + index lines
  • Relief and drainage layers
  • Elevation and slope at any point

02 / GPS recording

Walk it. It’s on the map.

Hit record and walk the flag line with your phone in your pocket. shrigdigs lays the track down as you go and files it on the crew map, which is built to stay crew-only.

  • Live track, time and distance
  • Pause and pick it back up
  • Saved to the crew map

03 / Sketch + edit

Draw the line that isn’t there yet.

Rough in a reroute, drag the nodes around, and watch length and grade update while you argue about it. Try three options before you cut one.

  • Draft lines beside built trail
  • Drag, split and re-join
  • Live length and grade

04 / Elevation + grade

Know where it’s too steep to hold dirt.

A full elevation profile for every line, with grade colored segment by segment. Find the fall-line sections before the winter rain finds them for you.

  • Scrub the profile, ride the map
  • Average and max grade
  • Feet or meters

05 / Trail features

Every jump, berm and drop. Pinned.

Tabletops, step-downs, drops, berms, rollers, ladders, drains. Pin each one where it sits, with its dimensions and what shape it’s in.

  • Feature library built for dirt
  • Size and condition
  • Tap a pin for the detail

06 / Map filters

Show only what matters today.

Build your own view. Just the jumps, just the woodwork, or just the stuff that’s blown out and needs a shovel before the weekend.

  • Filter by feature type
  • Filter by condition
  • Mix your own view

Every lip. Every landing.

A feature library made by people who shape dirt. Two taps to pin it, and the map remembers it for the next person who asks “which corner?”

  • Tabletop
  • Gap
  • Step-down
  • Drop
  • Berm
  • Rollers
  • Ladder
  • Rock roll
  • Skinny
  • Drain

03 / Build + maintain

Dig days, sorted.

Trail work is ten percent digging and ninety percent working out who’s bringing the McLeod. shrigdigs handles the ninety.

No dig.No ride.

Dig day

6 of 9 in

Sat 07:30 / Line 07

Rebuild the step-down lip, clear drain 4. Meet at the gate.

  • McLeod ×2
  • Pulaski
  • Buckets ×4
  • Tamper
  • Folding saw
  • Mg
  • Du
  • Tb
  • Wr
  • Su
  • Ko

Task board

Line 07

Task board for Line 07

To dig 3

Repack step-down lipPin 08 / 2 people
Clear drain 4Pin 09 / 1 person
Re-deck cedar ladderPin 07 / 2 slats

Digging 2

Armor roller 2Pin 02 / Du, Tb
Bench the rerouteDraft 3 / Mg

Riding 2

Rock drop landingPin 05 / fresh
Catch berm rebuildPin 10 / fresh

Work log

This season 212 hrs

Work log

  1. Sun
    Rock drop landing lengthened and packed3 diggers / 4.5 hrs / Pin 05
  2. Thu
    Blowdown cleared off the upper traverse1 digger / 1 hr / saw
  3. Last wk
    Catch berm rebuilt, drain cut on the exit5 diggers / 6 hrs / Pin 10

04 / Crew comms

Talk where the dirt is.

Threads pinned to places, not buried in a group chat. Condition reports, dig-day call-outs and the argument about that lip, all attached to the lip.

Line 07 is riding

Tacky. Send it, then bring a rake.

Invite-only beta

Get your crew on the map. Keep everyone else off it.

We’re letting crews in a few at a time while we build. Tell us who you are and we’ll be in touch when there’s a spot.